Last updated: October 16, 2009
Unless otherwise indicated, the capabilities shown in the tables apply to both the E1966A and the E6706A applications.
Supports Band Classes 0, 1, 3, 4, 5, 6, 10 and 14. See Cell Band . |
||
3.2.1 Demodulation of Forward Traffic Channel in AWGN |
See Testing 3.2.1 Demodulation of Forward Traffic Channel in AWGN . |
|
3.2.2 Demodulation of Forward Traffic Channel in Multipath Fading Channel |
Requires external fader and AWGN generator. For example, the E5515C Fading Solution, see Digital Bus Information for reference information. ( Lab Application Only ) See also Testing 3.2.2 Demodulation of Forward Traffic Channel in Multipath Fading Channel (Lab Application Only) . |
|
3.2.3 Decision of Power Control Bit for Channels Belonging to Different Power Control Sets During Soft Handoff |
Requires soft handoff capability. | |
3.2.4 Decision of Power Control Bit for Channels Belonging to the Same Power Control Set |
Requires soft handoff capability. | |
3.2.5 Demodulation of Reverse Power Control Channel During Soft Handoff |
Requires soft handoff capability. | |
See Testing 3.2.6 Demodulation of ARQ Channel | ||
3.3.1 Receiver Sensitivity and Dynamic Range | Yes | |
Partially | ||
Partially | Requires external CW signal generator. | |
4. Transmitter Tests | ||
Supports Band Classes 0, 1, 3, 4, 5, 6, 10 and 14. See Cell Band . |
||
Yes | See Testing 4.2.2 Waveform Quality and Frequency Accuracy . | |
Partially | ||
4.2.2 Waveform Quality and Frequency Accuracy | See Testing 4.2.2 Waveform Quality and Frequency Accuracy . | |
Partially |
Supports 100% forward packet activity only (see Fixed Settings ). See Testing 4.3.1 Range of Open Loop Output Power . If you want to view the access probe sequence graphically, use Measuring Graphical Access Probe Power ( Lab Application Only ). |
|
4.3.2 Time Response of Open Loop Power Control | ||
Supports tests 1 and 3-11, Minimum Standard (a) only, by remote program only. | ||
4.3.5 Minimum Controlled Output Power | See Testing 4.3.5 Minimum Controlled Output Power | |
Supports idle standby output power fully. Supports measurement of standby power between access probe bursts by remote program only. |
||
4.3.7 RRI Channel Output Power | See Testing 4.3.7 RRI Channel Output Power | |
4.3.8.1 DRC Channel Output Power | See Testing 4.3.8 Code Domain Power | |
4.3.8.2 ACK Channel Output Power | See Testing 4.3.8 Code Domain Power | |
4.3.8.3 Data Channel Output Power | Partially | |
Yes |
This test is only used for subtype 2 physical layer testing. See Testing 4.3.8 Code Domain Power |
|
E1966A 1xEV-DO Terminal Test Application Revision Information
C.S0029 Test Application Specification Description (TAP/ETAP/MCTAP)