Programming
Last updated: June 30, 2006
The test set is programmable through the GPIB (General Purpose Interface Bus) located on the rear panel. This page is to help you program the test set including:
Getting Started with Programming
(generic programming procedure and comprehensive program example),
Programming Examples for Individual Measurements
and
General Programming
(including test system synchronization).
If you have trouble finding the information you need below, use the search field at the top of this page to search the contents of this guide.
Getting Started with Programming
-
Programming: Getting Started Guide for 1xEV-DO Terminal Test
- It provides a general approach to configuring the test set's base station emulator, setting up a test data connection and performing measurements programmatically. It is developed based on a TAP test data connection, but the general procedure also applies to the tests in an ETAP test data connection.
-
Control Program Examples
- It provides two comprehensive programming examples, one for testing an AT based on TAP test data connection and another for testing an AT based on ETAP test data connection.
Programming Examples for Individual Measurements
General Programming
The following section provides links to the general programming topics including:
Programming for Data Connection Processing
Programming for Making Measurements
Test System Synchronization
|