Time Response of Open Loop Power Control Troubleshooting
Last updated: May 24, 2006
No other measurements can be running while the TROLPC measurement is active. If any measurements are running, they are closed when TROLPC is initiated, and a message is displayed indicating that a measurement has been closed. Activating another measurement inactivates the TROLPC measurement.
Possible Setup Issues
-
You must establish an RTAP (for Subtype 0 Physical Layer) or RETAP (for Subtype 2 Physical Layer) connection to perform the TROLPC measurement (see
How Do I Open a Session and Test Data Connection?
).
-
C.S0033 does not specify that the R-ACK Channel must be active for 4.3.2 Time Response of Open Loop Power Control. If the R-ACK Channel is active during this test, the access terminal's power may fall outside of the mask specifications. To help ensure that your access terminal does not fail this test, you should disable the R-ACK Channel by setting
ACK Channel Bit Fixed Mode Attribute
to off and setting
AT Directed Packets
to 0%.
Troubleshooting Techniques
-
Check to see if an integrity indicator other than 0 (normal) was returned with a measurement result (see
Integrity Indicator
).
|