Testing 4.4.2 Time Response of Open Loop Power Control
Definition: Following a step change in the mean input power, the mean output power of the mobile station changes as a result of the open loop power control. This test measures the open loop power control time response to a step change in the mean input power.
The following test procedure assumes that the mobile station supports Band Class 1 (US PCS) and only demonstrates the Test 1. You should change the settings as specified for other tests. Unless otherwise stated, leave all parameter settings to the defaults.
-
- Connect the mobile station's antenna output to the test set's front panel RF IN/OUT connector and power them on.
- Press the blue SHIFT and then the green Preset key to full reset the test set.
- Establish a call with the following parameter settings (some settings may change as specified for each test).
-
- Press CALL SETUP to access Call Parms and Call Control menus.
- Set
Cell Band
( F8 on the Call Parms 1 of 3
) to US PCS
.
- Set
Radio Config
( F11 on the Call Parms 1 of 3
) to (Fwd1, Rvs1)
.
- Select FCH Service Option Setup ( F12 )
(Call Parms 1 of 3)
, set Service Option for Fwd1, Rvs1
to SO2 (Loopback)
.
- Set
Traffic Data Rate
( F12 on the Call Parms 2 of 3
) to Full
.
- Press
Originate Call
( F3 ) to initiate a call. Verify that the Connected
is in the Active Cell status
field.
- Set
Cell Power
(Î or ) to -60 dBm/1.23 MHz
( F7 on the Call Parms 1 of 3
).
- Set
Rvs Power Ctrl
to Alternating bits
( F7 on the Call Parms 2 of 3
menu) to send alternating '0' and '1' power control bits on the Forward Traffic Channel.
- Press the Measurement selection key and select the
Time Response of Open Loop Power Control
measurement.
- Press the
Time Response of OLPC Setup
( F1 ) key to access the Time Response of OLPC Setup
menu.
-
- Set F-FCH/Traffic Level to -7.4 dB.
- Press
Close Menu
( F6 ).
- Measure the TROLPC and observe the Pass/Fail result:
-
- Select
Start Meas Up
( F2 ) which automatically increases Cell Power
by 20 dB and captures the resulting mobile station output power for 100 ms, observe that the cell power transitions to -40 dBm/1.23 MHz and note the pass/fail result.
- Select
Start Meas Down
( F3 ) which automatically decreases Cell Power
by 20 dB and captures the resulting mobile station output power for 100 ms, observe that the cell power transitions to -60 dBm/1.23 MHz and note the pass/fail result.
- Select
Start Meas Down
( F3 ) which automatically decreases Cell Power
by 20 dB and captures the resulting mobile station output power for 100 ms, observe that the cell power transitions to -80 dBm/1.23 MHz and note the pass/fail result.
- Select
Start Meas Up
( F2 ) which automatically increases Cell Power
by 20 dB and captures the resulting mobile station output power for 100 ms, observe that the cell power transitions to -60 dBm/1.23 MHz), and note the pass/fail result.
- After finishing the measurements:
-
- If desired, turn the measurement off by pressing the Measurement selection key, selecting
Time Response of Open Loop Power Control
, then Close Measurement
( F4 ).